Brand Name : ZNLS
Model Number : PF-J160
Place of Origin : China
MOQ : 25 tons
Price : Negotiation
Payment Terms : 30%TT, Balance against copy of BL
Supply Ability : 400 to 500 tons per month
Delivery Time : 14 to 21 days after deposit
Packaging Details : In bundle or pallets, or by customer demands
Material : Steel
Surface treatment : Powder coated
Lifting method : By crane
Bracket width : 1.6m
Usage field : Media height building with limited space
Application : Cantilever working platform to support wall form
J160-2 Jumped climbing formwork - Simple moving procedure by crane
Overview
Jumped climbing formwork J160-2 is mainly used in the concrete casting in high-rise buildings structures. The lateral pressure of the concrete is supported by the anchor and high tensile bolt. The formwork does not require additional measures to secure it. A large surface area is covered for a one-time altitude concrete pouring. It is a simple and fast process where the concrete has a smooth finishing which is durable and cost-effective.
Characteristics
1 . The support structure, load of the bracket, formwork and other materials are all supported by the anchor and the use of the scaffolding is not required.
2 . The tripod can be folded. It is quick to assemble and dismantle, convenient to store, transport and reusable.
3 . Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.
Value-added Service
ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.
Simple Moving Cantilever Scaffolding System , Hanging Scaffolding Systems Images |