Sign In | Join Free | My benadorassociates.com
China ZNLS ENGINEERING CO., LTD. logo
ZNLS ENGINEERING CO., LTD.
ZNLS ENGINEERING MOST EXCELLENT FORMWORK SOLUTION
Active Member

10 Years

Home > Climbing Formwork System >

C240-3 Rail Climbing System Easily Assembled Powder Coated Surface Treatment

ZNLS ENGINEERING CO., LTD.
Contact Now

C240-3 Rail Climbing System Easily Assembled Powder Coated Surface Treatment

Brand Name : ZNLS

Model Number : PF-C240

Place of Origin : China

MOQ : 25 tons

Price : Negotiation

Payment Terms : 30%TT, Balance against copy of BL

Supply Ability : 400 to 500 tons per month

Delivery Time : 14 to 21 days after deposit

Packaging Details : In bundle or pallets, or by customer demands

Material : Steel

Surface treatment : Powder coated

Lifting method : Platform with wall form in one crane lift

Bracket width : 2.4m

Retrusive distance : 0.65m

Climbing rail : Available

Contact Now

C240-3 Rail climbing formwork - Easily assembled, saves time and money

Overview

It is mainly used in the concrete casting in the structures of bridges, high-rise buildings. The lateral pressure of the concrete is supported by the anchor and high tensile bolt. The formwork does not require additional measures to secure it. A large surface area is covered at a one-time altitude concrete pouring. It is a simple and fast process where the concrete has a smooth finishing which is durable and cost-effective.

Characteristics

1 . The formwork can be reversed to 650mm as a unit.

2 . The formwork and steel waler are able to be reversed as an unit; as such, it is easy to clean the panel, tighten of steel and etc.

3 . The formwork is flexible to use; it can be adjusted in all directions according to the structures.

Value-added Service

ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.C240-3 Rail Climbing System Easily Assembled Powder Coated Surface Treatment

Product Tags:

Jump Form Formwork System

      

Rail Climbing System

      
Quality C240-3 Rail Climbing System Easily Assembled Powder Coated Surface Treatment for sale

C240-3 Rail Climbing System Easily Assembled Powder Coated Surface Treatment Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: ZNLS ENGINEERING CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)